Project Overview
The design of the new lab prioritized safety and accessibility. Key features include an emergency eye wash station, a gas shut-off system, and an additional exterior exit to ensure a secure learning environment. The lab also integrates cutting-edge virtual and augmented reality technology with ZSpace stations, allowing students to engage in immersive, multi-sensory experiences. These tools enable real-time collaboration and problem-solving, with students’ work shared with the entire class for a more interactive learning experience.
Beyond its functional use, the science lab symbolizes progress and opportunity. A fire-rated glass opening allows natural light to pour in and provides a view into the dynamic learning environment. For both students and teachers, the lab is more than just a classroom—it serves as a springboard for scientific discovery, innovation, and a brighter future for all involved.
Services
Architecture
Electrical
Mechanical
Technology
Project Size
1,700 SF
Project Cost
$477,000
Project Contact
Robert Englund
School District for the City of Pontiac
Project Team
Architect and Engineer
IDS
General Contractor
Heritage Contracting
