Project Overview

Over the course of several years, research labs had taken over the majority of the building that was once home to the Department of Mechanical Engineering. This created a condition where all of the academic spaces for this department had been scattered across campus creating a disjointed experience for students and visitors. In an effort to correct this, the department set out to renovate this building with two main goals in mind.

Goal number one was to put engineering on display so that students, parents, visitors, and even prospective students could see the exciting work that was once hidden behind concrete block walls and spread across campus.

The second goal would be to create a new home for the Department of Mechanical Engineering bringing researchers, students, faculty, and administrative staff into one main location.

In order to achieve these goals, renovation had to be precise due to the limited budget and the need to keep the many research labs active. The 3D plan views to the right show a color coded extent of renovation. While the entire building would receive complete replacement of the mechanical and electrical infrastructure, the circulation and offices shaded in aqua would also receive only cosmetic updates. Research labs shaded in blue would benefit from minor renovation including some slight reconfiguration, while the academic core shown shaded in orange would be completely reconfigured to satisfy the two main goals.

GG Brown Interior
GG Brown Reno
DSC04743h
DSC04752h
DSC04761h
DSC04767h
previous arrow
next arrow
GG Brown Reno
DSC04743h
DSC04752h
DSC04761h
DSC04767h
previous arrow
next arrow

Services

Architecture
Electrical
Energy & Sustainability
Interiors
Mechanical
Technology

Project Size

210,870 SF

Project Cost

$47,000,000

Project Contact

John Keedy
University of Michigan

Project Team

Architect and Engineer
IDS
Design Partner
Perkins + Will
Laboratory Planner
Jacobs Consultancy
General Contractor
DeMaria

Featured Projects