Size
Project Size
13,100 sq. ft.
DATES
Completion Date
2012-09-15
COST
Construction Cost
$4,700,000
Client Contact
Ken Silverman Michigan Medicine
[X]

With this project IDS helped Michigan Medicine convert their 3-meal/day food service protocol to an on-demand food service protocol. The entire existing kitchen was completely renovated, from top to bottom, in a multi-phased approach, keeping portions of the kitchen active throughout construction, maintaining food service to patients. Existing kitchen space in the North Campus Research Center was used to offset the spaces under construction. Elevator controls were replaced to provide Food Service staff priority, ensuring timely delivery of hot/cold meals. IDS worked directly with JEM Associates, who designed the food service equipment layout.

Project Overview

  • Multi-phased, complete renovation of existing, active kitchen.
  • Project allowed Michigan Medicine to begin on-demand meal service.
  • Replaced elevator controls for Food Service staff priority.

Project Team

Principal-In-Charge, Construction Administrator
Project Architect
Mechanical Engineer
Electrical Support
Thomas J. Manardo
Construction Manager
DeMaria