Size
Project Size
20,000 sq ft
DATES
Completion Date
2017-08-15
COST
Project Cost
$10,866,000
Client Contact
Gregory Ianni, Scott Gardner Michigan State University
[X]

The Spartan Stadium South End Zone Addition was the third phase of a multi phased master plan update of the Stadium following the West Tower and North End Zone Additions. Functionally, the South End Zone Addition provides much needed fan amenity spaces with four new major concession stands and 236 additional restroom fixtures including Family focused facilities. The South End Zone Addition takes its building envelope material palette from the West Tower Addition and Homeland Security Entry Gates from the North End Zone Project. While the North End Zone Addition was all about the Football Team, the South End Zone Addition is about the Fans. The plaza outside the South End Addition will become the site that will house recognitions of long standing season ticket holders and a commissioned Art on Campus piece that is intended to another iconic photo opportunity place on campus.

 

Project Overview

  • Creation of an addition to the south end of Spartan Stadium to house additional restroom and concession facilities along with new ticket gate entrances.
  • An aggressive schedule with design start in December 2016 and completion desired for the start of the 2017 Football Season utilized a design build delivery method to achieve the goal.
  • Toilet rooms can be isolated from the Stadium pre-game to allow usage by tailgating fans and then converted to Stadium access only as the gates are opened.

Project Team

Principal-In-Charge
Project Designer
Project Architect
Marek Nowakowski, Assoc. AIA
Mechanical Engineer
Specifications Writer
Construction Administrator
Structural Consultant
SDI Structures
Civil Consultant
Beckett & Raeder, Inc
Landscape Consultant
Beckett & Raeder, Inc
Construction Manager
Granger Construction